Glossary entry (derived from question below)
English term or phrase:
Build-to-Print
Romanian translation:
(asamblare/executie) conform specificaţiilor
Added to glossary by
Radu DANAILA
Oct 20, 2010 06:43
13 yrs ago
2 viewers *
English term
Build-to-Print
Homework / test
English to Romanian
Tech/Engineering
Law: Contract(s)
Technical specifications
"XXXX will receive on time from XXXX the necessary inputs foreseen in the XXXX Quality Management process deposited with the XXXX Authorities and in accordance with Build-to-Print, Detailed Design and Functional Specification status agreed in 2001."
Proposed translations
(Romanian)
4 +1 | asamblare conform specificaţiilor | Olar Adrian Marius |
Proposed translations
+1
1 hr
Selected
asamblare conform specificaţiilor
-
--------------------------------------------------
Note added at 2 days7 hrs (2010-10-22 14:12:06 GMT) Post-grading
--------------------------------------------------
Multumesc si eu!
--------------------------------------------------
Note added at 2 days7 hrs (2010-10-22 14:12:06 GMT) Post-grading
--------------------------------------------------
Multumesc si eu!
4 KudoZ points awarded for this answer.
Comment: "Am ales "conform specificatiilor", ca fiind soluitia generica (nu doar pentru asamblare). Multumesc!"
Reference comments
8 hrs
Reference:
e un tip de contract
http://definitions.uslegal.com/b/build-to-print-contract/
Build-to-print contract is a contract which requires the contractor to build a product according to the exact technical specifications given by a customer. The design specifications are explicit and are often coupled with performance specifications. Therefore, the contractor hardly has any discretion in deciding how to perform. Most of the
http://definitions.uslegal.com/b/build-to-print-contract/
Build-to-print contract is a contract which requires the contractor to build a product according to the exact technical specifications given by a customer. The design specifications are explicit and are often coupled with performance specifications. Therefore, the contractor hardly has any discretion in deciding how to perform. Most of the