In all cases, when pressuring up, watch the pressure gauge at the control panel until the test pressure has been reached:
• the test pressure is specified by the recognized standard for the particular size and product being tested
• test pressures and test procedures are referenced on all Production Order Routings (see the procedural documents)
• copies of these documents are in the Production Data Book or job folder maintained in the assembly and test areas
Спасибо!
• the test pressure is specified by the recognized standard for the particular size and product being tested
• test pressures and test procedures are referenced on all Production Order Routings (see the procedural documents)
• copies of these documents are in the Production Data Book or job folder maintained in the assembly and test areas
Спасибо!
Proposed translations
(Russian)
3 +1 | техническая карта производственного заказа | Victor Sidelnikov |
4 | технологическая карта производственного заказа | Katerina O. |
Proposed translations
+1
1 hr
Selected
техническая карта производственного заказа
ибо здесь испытательные давление и методики испытаний ссылаются на соответствующие техкарты, а не просто так, из головы
4 KudoZ points awarded for this answer.
14 hrs
технологическая карта производственного заказа
SAP sterm:
routing (PP; System text; 2008.01.16)
технологическая карта
order-specific routing (LO-VC; Documentation; 2002.05.16)
технологическая карта для заказа
production order (IS-A-VMS, IS-AFS, LO-VC, PP, PP-SFC, SBO, SCM-APO-PPS, SRD-SCM-WME; System text; 2006.11.07)
производственный заказ
ИЛИ
production order (SCM-APO-SPP; System text; 2008.12.19)
заказ на производство
routing (PP; System text; 2008.01.16)
технологическая карта
order-specific routing (LO-VC; Documentation; 2002.05.16)
технологическая карта для заказа
production order (IS-A-VMS, IS-AFS, LO-VC, PP, PP-SFC, SBO, SCM-APO-PPS, SRD-SCM-WME; System text; 2006.11.07)
производственный заказ
ИЛИ
production order (SCM-APO-SPP; System text; 2008.12.19)
заказ на производство