This question was closed without grading. Reason: No acceptable answer
Sep 7, 2014 02:28
9 yrs ago
Spanish term
chuleado
Spanish to English
Tech/Engineering
Construction / Civil Engineering
Obligations of subcontrac
SEGURIDAD, HIGIENE Y MEDIO AMBIENTE
OBLIGACIONES DE SUBCONTRATISTAS Y PROVEEDORES
Chuleado y reparaciones de elementos que se requieran de acuerdo a acabado establecido. (not much context as it just appears in a list of tasks to be performed in the construction site)
Mexican Spanish into US English
OBLIGACIONES DE SUBCONTRATISTAS Y PROVEEDORES
Chuleado y reparaciones de elementos que se requieran de acuerdo a acabado establecido. (not much context as it just appears in a list of tasks to be performed in the construction site)
Mexican Spanish into US English
Proposed translations
(English)
4 +1 | rendering | neilmac |
3 | accessories | David Hollywood |
Proposed translations
12 mins
accessories
English Translation of CHULEARtransitive verb
Mexico, familiar : to compliment
--------------------------------------------------
Note added at 13 mins (2014-09-07 02:41:58 GMT)
--------------------------------------------------
not sure here but maybe
Mexico, familiar : to compliment
--------------------------------------------------
Note added at 13 mins (2014-09-07 02:41:58 GMT)
--------------------------------------------------
not sure here but maybe
Peer comment(s):
neutral |
neilmac
: That would be "complements" rather than "compliments"... no?
5 hrs
|
+1
5 hrs
rendering
Based on to Judith's links.
rend·er/ˈrendər/
verb
... 6.cover (stone or brick) with a coat of plaster.
rend·er/ˈrendər/
verb
... 6.cover (stone or brick) with a coat of plaster.
Note from asker:
Thanks for the idea but I went for another term.... |
Discussion
5. To give (wood, for example) a desired or particular surface texture.
http://www.thefreedictionary.com/finishing
Coating -
1. a layer or film spread over a surface for protection or decoration
1. a layer of any substance spread over a surface.
I think this might also fit here, along the lines of the links that Judith posted
http://www.imperermita.com.mx/fichas/pdfs/concreto/Fester-CM...
RENDIMIENTO
El producto preparado en consistencia de pasta para reparaciones, un saco de 25 Kg. con su respectiva agua produce aproximadamente 14.0 litros de mezcla con lo que deberá considerase su equivalente en las secciones a reparar.
Preparado para mezcla fluida para chulear, un saco de 25 Kg preparado con su respectiva agua produce aproximadamente 14.5 litros de mezcla.
http://www.limpro.mx/reparaciones-concreto.htm
Al usar el producto Tilt Finish eliminamos las viejas técnicas de ‘chulear’ un elemento de conreto con alguna combinación de cemento que lo único que hace es crear una delgada capa que posteriormente se caerá evidenciando una mala calidad en los acabados.
http://www.fester.com.mx/Noticia.aspx?id=62
- Agrega 4.5 litros de agua por saco de 25 kg y obtendrás una mezcla fluida para dar un acabado uniforme o “chulear” estructuras de concreto.