Protections and pre-requisites per section before commencing this Job Plan to Visual check
TASK
ID
DESCRIPTION - PROCEDURE OF VISUAL CHECK
1
Check cracks, overheating, deformation, leakage, etc. of the body, surface, welded joints, etc.
2
Check Corrosion of the outer surface, damage to the peeling, moisture, abnormal vibration, noise, and friction of adjacent pipes or components
3
Check damage of the supporting, foundation sinking, tilting, cracking, and tightening of the bolts.
4
Check if the safety accessories such as PG, TG, PSV meet the specified requirements.
Protections and pre-requisites per section before commencing this Job Plan to Visual check
TASK
ID
DESCRIPTION - PROCEDURE OF VISUAL CHECK
1
Check cracks, overheating, deformation, leakage, etc. of the body, surface, welded joints, etc.
2
Check Corrosion of the outer surface, damage to the peeling, moisture, abnormal vibration, noise, and friction of adjacent pipes or components
3
Check damage of the supporting, foundation sinking, tilting, cracking, and tightening of the bolts.
4
Check if the safety accessories such as PG, TG, PSV meet the specified requirements.
Proposed translations
(French)
3 +4 | support | alex.saviano |
Proposed translations
+4
2 mins
Selected
support
je dirais...
Note from asker:
@ Tony M Korean, actually. Thanks to you all for your great help ! |
4 KudoZ points awarded for this answer.
Comment: "Merci !"
Something went wrong...