Glossary entry (derived from question below)
French term or phrase:
régie horaire
English translation:
work / copacker schedule
Added to glossary by
Duncan Moncrieff
Sep 2, 2014 07:42
9 yrs ago
1 viewer *
French term
régie horaire
French to English
Bus/Financial
Management
copacking contract. This seems to be "contracting on a per-time basis", but I'm not sure and don't know the best EN management way of putting it.
NB this text appears to be written in Belgian French.
"IV- Déconditionnement / Régie horaire
Identification par le Demand Planner des références à déconditionner et du résultat souhaité => fichier de régie horaire envoyé à copacker, Achats et cellule copacking.
Transfert(s) créé(s) et validé(s) par le copacker (33 PAL max)
Le Demand Planner doit fournir au copacker des cartons à plat, si nécessaire pour les références issues des boxes qu’il souhaite remettre en cartons, de produit standard.
Une fois l’opération de déconditionnement réalisée physiquement, le copacker renvoie le fichier Excel Régie Horaire aux Achats et cellule Copacking avec le détail du nombre d’heures à facturer et le détail des mouvements de stocks à régulariser dans SAP. (Action = Cellule Copacking)
Cas Particuliers
Régie horaire envoyée trop tard, déconditionnements trop importants :
En cas d’ impossibilité de valider le déconditionnement avant la fin du mois, le timing de déconditionnement et les priorités doivent être validés en accord avec le Demand Planner.
Rupture de semi-fini :
Si le Demand Planner demande une régie horaire pour récupérer un semi-fini en rupture, le déconditionnement (et la régularisation des stocks SAP) est à faire au plus vite. Le timing est à valider avec le Demand Planner."
NB this text appears to be written in Belgian French.
"IV- Déconditionnement / Régie horaire
Identification par le Demand Planner des références à déconditionner et du résultat souhaité => fichier de régie horaire envoyé à copacker, Achats et cellule copacking.
Transfert(s) créé(s) et validé(s) par le copacker (33 PAL max)
Le Demand Planner doit fournir au copacker des cartons à plat, si nécessaire pour les références issues des boxes qu’il souhaite remettre en cartons, de produit standard.
Une fois l’opération de déconditionnement réalisée physiquement, le copacker renvoie le fichier Excel Régie Horaire aux Achats et cellule Copacking avec le détail du nombre d’heures à facturer et le détail des mouvements de stocks à régulariser dans SAP. (Action = Cellule Copacking)
Cas Particuliers
Régie horaire envoyée trop tard, déconditionnements trop importants :
En cas d’ impossibilité de valider le déconditionnement avant la fin du mois, le timing de déconditionnement et les priorités doivent être validés en accord avec le Demand Planner.
Rupture de semi-fini :
Si le Demand Planner demande une régie horaire pour récupérer un semi-fini en rupture, le déconditionnement (et la régularisation des stocks SAP) est à faire au plus vite. Le timing est à valider avec le Demand Planner."
Proposed translations
(English)
3 +1 | work / copacker schedule | Duncan Moncrieff |
3 | scheduling process/procedure | liz askew |
Change log
Oct 13, 2014 06:57: Duncan Moncrieff Created KOG entry
Proposed translations
+1
1 hr
Selected
work / copacker schedule
It looks like the client sends the "régie horaire" file, containing the list of things to prepare (and possibly for when), to the copacker, procurement and the copacking team. After the copacker has done the work, they send a modified version of the file back that states the number of hours to be billed for the work done, as well as the stock movements that have occurred.
So it looks like the file is a "work schedule", or in this case a "copacker schedule" for managing the demand made of the copacker, etc.
So it looks like the file is a "work schedule", or in this case a "copacker schedule" for managing the demand made of the copacker, etc.
4 KudoZ points awarded for this answer.
Comment: "thanks"
29 mins
scheduling process/procedure
https://www.google.co.uk/webhp?sourceid=chrome-instant&ion=1...
--------------------------------------------------
Note added at 30 mins (2014-09-02 08:13:10 GMT)
--------------------------------------------------
- CPS Shanghai Supply Chain Manager - Shanghai China ...
careers.peopleclick.com/careerscp/client_cocacola/.../gateway.do?...
... management, evaluation and improvement of the supply chain process which covers procurement of key raw materials from suppliers (ingredient suppliers, primary packaging, co-packers), planning (demand, inventory management, master production scheduling), .... Demand Management & Capability Planning (Excel)
[PDF]
Capacitated Scheduling of Multiple Products on a ... - MIT
web.mit.edu/edmund_w/www/ditri[1].pdf
by MP D’ITRI - Cited by 10 - Related articles
its own and its co-packer's production lines. ... uling process uses a 13-week rolling time horizon with ... mented the scheduling procedure using an Excel.
--------------------------------------------------
Note added at 30 mins (2014-09-02 08:13:10 GMT)
--------------------------------------------------
- CPS Shanghai Supply Chain Manager - Shanghai China ...
careers.peopleclick.com/careerscp/client_cocacola/.../gateway.do?...
... management, evaluation and improvement of the supply chain process which covers procurement of key raw materials from suppliers (ingredient suppliers, primary packaging, co-packers), planning (demand, inventory management, master production scheduling), .... Demand Management & Capability Planning (Excel)
[PDF]
Capacitated Scheduling of Multiple Products on a ... - MIT
web.mit.edu/edmund_w/www/ditri[1].pdf
by MP D’ITRI - Cited by 10 - Related articles
its own and its co-packer's production lines. ... uling process uses a 13-week rolling time horizon with ... mented the scheduling procedure using an Excel.
Note from asker:
thanks... think this is on the right lines... but it appears to be a physical thing which can be "sent back too late" |
Discussion
So it looks like the file is a "work schedule", or in this case a "copacker schedule" for managing the demand made of the copacker,etc.