Glossary entry

German term or phrase:

störungsmodifizierter Bauzeitenplan

English translation:

disruption-adjusted/modified construction schedule

Added to glossary by Robert Dunn
Mar 8, 2016 14:32
8 yrs ago
1 viewer *
German term

störungsmodifizierter Bauzeitenplan

German to English Bus/Financial Construction / Civil Engineering
I am translating an article (for a UK audience) which briefly touches upon this subject (referring to methods in which a claim can be substantiated) and I am lost as to what "störungsmodifizierter" in "störungsmodifizierter Bauzeitplan" means. I have searched extensively to no avail.

Any assistance is appreciated.

Context:

Dem Dokument müssen prüffähige detaillierte Nachweise für die Konsequenzen aus der Behinderung beigefügt werden.
So zum Beispiel detaillierte Stundennachweise, ein ***störungsmodifizierter Bauzeitenplan***, Rechnungen von Dritten für erbrachte Mehrleistungen zur Behandlung der Behinderung.
Change log

Mar 8, 2016 15:50: Steffen Walter changed "Field (write-in)" from "störungsmodifizierter Bauzeitenplan" to "(none)"

Jun 10, 2020 10:21: Steffen Walter changed "Field" from "Other" to "Bus/Financial"

Proposed translations

+1
18 mins
Selected

disruption-adjusted/modified construction schedule

Something along these lines I would say...


lexikon.immobilien-fachwissen.de/index.php?...
Traducir esta página
english: construction schedule. Im Bauzeitenplan wird der vorgesehene zeitliche Ablauf des Bauvorhabens und ... Er muss aber keinen Bauzeitenplan erstellen.
Bauzeitenplan - ProZ.com

--------------------------------------------------
Note added at 28 mins (2016-03-08 15:01:18 GMT)
--------------------------------------------------

or: readjusted construction/building schedule due to disruptions/delays ("delays" is stretching it but maybe...)
Peer comment(s):

agree dkfmmuc : As non-native speaker I would prefer *disruption-adjusted*, *modified* could have any reason and may be a bit weak and not "spicy" enough.
1 hr
Something went wrong...
3 KudoZ points awarded for this answer. Comment: "Thank you"
30 mins

modified construction schedule that takes into account the disruption

It's a little wordy, but I think it makes things clear.
Something went wrong...
6 hrs

adjusted post-incident construction schedule

Another choice.
Something went wrong...
Term search