Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
- May 16 fra>eng INGÉNIEUR DE CORPS D’ÉTAT SECONDAIRE engineer of the State Infrastructure Corps pro closed ok
- Jun 8 '22 fra>eng mandataire de la maîtrise d'oeuvre representative of the project management pro closed no
- Jun 29 '21 fra>eng protection du talus protection of an excavation site/sloping terrain pro closed no
- Mar 22 '21 fra>eng maîtrise d'ouvrage d'exécution construction operation supervision pro closed no
- Jan 21 '21 fra>eng délai partiel d’exécution partial completion deadline pro closed ok
- May 29 '20 fra>eng délai d'épreuve time allowed for the floor testing pro just_closed no
- May 24 '19 fra>eng corps de l'ouvrage building structure pro closed ok
- Aug 11 '18 fra>eng DOE (Dossier des Ouvrages Executés) set of record drawings pro closed no
- Jun 6 '18 fra>eng pérennisation that the systems ( ) are perennial pro closed ok
- Aug 27 '17 fra>eng cautionnement solidaire mutual guarantee pro closed no
4 Aug 27 '17 fra>eng sous forme d'assurance turned into an insurance easy closed no
- Jul 5 '17 fra>eng Synthèse summary pro closed ok
- Jan 20 '17 fra>eng Spécifications et Cahier des charges building specifications and statement of intent pro just_closed no
4 Nov 4 '16 fra>eng contrat de vente itinérante itinerant sale contract pro closed ok
- Aug 7 '16 fra>eng sans/avec participation de la moyenne surface without/with involvement of supermarkets pro closed ok
- Apr 10 '16 fra>eng Cahier des charges et spécifications techniques specifications and technical specifications pro closed ok
- Apr 6 '16 fra>eng chaussée carriageway/roadway pro closed ok
4 Mar 2 '16 fra>eng colmater to plug the gaps (in the current situation) pro closed ok
- Jan 1 '16 fra>eng Projet de réhabilitation du Système d’Eau Potable project for upgrading the Drinking Water System pro closed ok
- Dec 10 '15 fra>eng maintien d'une chape en bois maintenance of a wood layer pro just_closed no
4 Nov 22 '15 fra>eng l'ensemble the complex easy closed no
- Nov 17 '15 fra>eng l’axe de hauteur placed at a level with 1.30 m coordinate on the depth axis/z-axis pro closed no
- Oct 21 '15 fra>eng déclarer le financement to declare how the machine was financed pro open no
4 Oct 17 '15 fra>eng finition finishing pro closed no
- Jun 10 '15 fra>eng exutoires outlets of sewage disposal pro open no
- May 11 '15 fra>eng appelé destined for pro closed ok
- Mar 24 '15 fra>eng digues levees/flood protections/embankments/dykes pro just_closed no
- Mar 6 '15 fra>eng notice paysagère landscaping plan pro closed ok
- Mar 5 '15 fra>eng Bureau d'expertise technical assessment consulting firm pro closed ok
- Jan 28 '15 fra>eng carreaux de plaque plaster blocks pro closed ok
4 Jan 24 '15 fra>eng conditions de réception specifications of supplies delivered pro closed ok
4 Dec 12 '14 fra>eng corps du Génie corps of engineers easy closed no
Asked | Open questions | Answered